Speak with a specialist

Case study: how Lagor Srl created flexibility and safety with air casters

C | mockup | CS | Lagor Srl

Download the case study for the manufacturing industry

Lagor Srl manufactures large transformer cores up to 200 tons. The weight, production process and weather created challenges for the internal transportation of the transformer cores. 

Read in this case study for the manufacturing industry:
  • Why Lagor Srl needed to improve its internal logistics process
  • How air cushion transport effectively handled the internal transportation of heavy loads, downtime in production and negative influence of the weather 
  • How air cushion transport resulted in flexibility and safety in the manufacturing process